6 minutes ago, The Beast said:

I was asked this question by my son who is doing his A level maths.

To complete the job it takes the stated cunts the following:

A & B = 2 days

A & C = 3 days

B & C = 4 days

So how long will it take A, B & C to complete the fucking job?

It’s gibberish.

The answer is KFC.

Fuck off.

  • Like 3
Link to comment
Share on other sites

1 hour ago, The Beast said:

I was asked this question by my son who is doing his A level maths.

To complete the job it takes the stated cunts the following:

A & B = 2 days

A & C = 3 days

B & C = 4 days

So how long will it take A, B & C to complete the fucking job?

4 days

Link to comment
Share on other sites

1 hour ago, The Beast said:

I was asked this question by my son who is doing his A level maths.

To complete the job it takes the stated cunts the following:

A & B = 2 days

A & C = 3 days

B & C = 4 days

So how long will it take A, B & C to complete the fucking job?

Are you sure you've written the numbers down correctly, you spud thick Mick? The mathematical method is fairly elementary, but the answer is unwieldy given those parameters.

  • Like 2
Link to comment
Share on other sites

52 minutes ago, Cuntybaws said:

Are you sure you've written the numbers down correctly, you spud thick Mick? The mathematical method is fairly elementary, but the answer is unwieldy given those parameters.

Less of the Mick, hun.

That is how his tutor wrote it. It is about how one works it out. 

Can you suss it?

Fucked if I could.

Link to comment
Share on other sites

20 minutes ago, The Beast said:

Less of the Mick, hun.

That is how his tutor wrote it. It is about how one works it out. 

Can you suss it?

Fucked if I could.

A+B in one day do 1/2 a job. A+C in one day do 1/3 of the job. B+C 1/4. Add the terms and A+B + A+C + B+C can do 13/12 of a job in one day. The left side of the equation resolves to 2(A+B+C) so A and B and C together can do 13/24 of the job in one day. Take the reciprocal of that for your answer. 

Link to comment
Share on other sites

2 hours ago, The Beast said:

I was asked this question by my son who is doing his A level maths.

To complete the job it takes the stated cunts the following:

A & B = 2 days

A & C = 3 days

B & C = 4 days

So how long will it take A, B & C to complete the fucking job?

If A, B and C a road workers for Southwark council then it'll fucking take ages.

Link to comment
Share on other sites

Alternatively, 2A + 2B + 2C can do three jobs in 2+3+4 i.e. 9 days. That’s equivalent to one job in 3 days. Divide both sides by two and A+B+C can do that one job in 1.5 days. 

But wait, that’s a different answer to before! If your brat can’t work out why they’re different, and which is correct, then I suggest he’d better start applying for media studies courses at the local polytechnic. 

Link to comment
Share on other sites

Guest Salty Piss Flap
6 hours ago, The Beast said:

I was asked this question by my son who is doing his A level maths.

To complete the job it takes the stated cunts the following:

A & B = 2 days

A & C = 3 days

B & C = 4 days

So how long will it take A, B & C to complete the fucking job?

I'm afraid not enough information was provided regarding the participants A,B and C.

Is one or more of them of African descent?

If so, how much extra time must be factored in to compensate for their innate laziness?

Is one or more of them a female?

If so, how much extra time must be factored in to represent any potential delay caused by a possible maternity leave or a sexual harassment complaint?

Do they belong to a labor union?

If so, how much extra time must be factored to represent the amount of time they'd purposely drag the job out by intentionally working slower?

Is one or more of them a teenager?

If so, how much extra time must be factored in to represent the amount of time their supervisor would have to spend instructing them over and over again on how to correctly do the job, or constantly having to tell them to take their headphones off and stop listening to their crappy music or to stop texting, put their smart phones away and get back to work?

A lot of variables there that would need to be addressed.

Link to comment
Share on other sites

7 hours ago, Cuntybaws said:

Alternatively, 2A + 2B + 2C can do three jobs in 2+3+4 i.e. 9 days. That’s equivalent to one job in 3 days. Divide both sides by two and A+B+C can do that one job in 1.5 days. 

But wait, that’s a different answer to before! If your brat can’t work out why they’re different, and which is correct, then I suggest he’d better start applying for media studies courses at the local polytechnic. 

Is any job involving three blokes going to take less than five weeks? .. And I would suggest legal studies would be the best option.

Link to comment
Share on other sites

9 hours ago, Eric Cuntman said:

Broadmoor looney bin run education programmes. Imagine some of their Maths problems...

 

'If it takes one man 4 minutes to chop up an old lady with a circular saw, how long does it take the same man to fuck a parakeet?'

@Quincy Cockfingers is still struggling with this one between being fisted by his granny raping cellmate 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...